Areas · county desk
Reel pickup in Washington, DC: small yards, tight streets, steady work
WASHINGTON — The desk picks up empty cable reels anywhere in the District and delivers wooden spools to District addresses. DC jobs rarely have room to store reels, so most pickups here are a handful of reels from a loading dock or an alley, not a laydown yard.
From the reel desk · Checked 9 November 2026
Schematic line map, not to survey: Washington, DC marked, with US-50, Route 1 drawn heavier. The Potomac, the Anacostia, the District line and the Beltway are drawn for bearings.
Fact box: Washington, DC
- Electric utility
- Pepco
- Big reel source
- Pepco's Capital Grid underground 230 kV work
- Industrial land
- Concentrated around Ivy City and New York Avenue NE
- ZIPs with town pages
- 20001, 20002, 20009, 20010, 20012, 20024
- Town pages
- 5
Where District reels come from
The biggest single source of cable in the city over the last few years has been Pepco’s Capital Grid project. The DC Public Service Commission describes it as about ten miles of new 230 kV underground transmission line, the rebuild of the Champlain and Harvard substations (built 60 to 110 years ago), the replacement of aging underground cable, and a new Mount Vernon substation at First and K Streets NW. Underground transmission cable ships on very large reels, many of them steel and returnable to the maker. Those go back. The wooden ones, and the smaller reels from the distribution work around them, are the District’s share of what the desk handles.
The rest comes from buildings. Office-to-residential conversions downtown, new apartment blocks along the Metro lines, school and hospital work, and the constant tenant fit-outs that keep electricians busy all end with reels. A fit-out on K Street might leave six 24 and 30 inch reels in a loading dock. A mid-rise in NoMa might leave twenty larger ones in the alley over a few weeks.
Why District pickups are small
There are almost no laydown yards inside the city. Contractors stage cable on the job, use it and need the reels gone before the next delivery blocks the dock. That means the District is a place for frequent small pickups, timed to a loading window, rather than a once-a-quarter yard clear-out. When you send a request, tell the desk where the reels are (dock, alley, garage level), whether there is a loading zone, and the hours the building allows deliveries.
Industrial corners
Ivy City and the New York Avenue NE corridor hold one of the city’s main concentrations of industrial and production uses. A 2025 letter from the local advisory neighbourhood commission to the Zoning Commission describes Ivy City as heavily concentrated with industrial and PDR (production, distribution and repair) uses, and opposes adding another large warehouse at the Montana Triangle. For reels, that corridor matters because it is where trade businesses, small yards and the people who build things from reels tend to be.
Buying a spool in the city
People in the District usually want one or two reels: a 30 or 36 inch reel for a rowhouse patio or a roof deck, or a reel to wind hose for a community garden. The desk delivers within the District; the questions are the same as for a pickup in reverse. Measure the gate or doorway, say how many steps, and say whether the reel has to go through the house.
Roads and timing
From Maryland, District pickups come in on New York Avenue (US-50) or Route 1; from Virginia, over the Potomac bridges. Midday windows between the rush hours work best for alley pickups. Weekend pickups depend on the building’s rules more than on traffic.
The District’s town pages
The five neighbourhood pages below cover different kinds of District work: Ivy City’s trades, Mount Vernon Triangle’s high-rise construction, Takoma’s small residential jobs on the Maryland line, the Southwest Waterfront’s big mixed-use builds, and Columbia Heights’ rowhouse renovations and retail.
Sending a request from Washington, DC
- Count and measure. Count the reels and measure the largest flange edge to edge across the face. A photo with the tape in it is better than a guess.
- Check the build. Nailed lumber, plywood sheet, steel or plastic. Look for a stencil or tag naming the maker and the reel number.
- Set aside steel and tagged returnables with their serial numbers. Those go back to the maker, not to the desk.
- Say where they stand: yard, dock, garage level, alley or curb, plus clearance, gate hours, badging or escort a driver needs.
- Say what loads them: forklift, pallet jack, loader, ramp, or only people. Reels over 42 inches weigh more than 100 lb empty.
- Say how often: one time, weekly, monthly or at each job close-out.
- Buying instead? Give the flange and height you want, how many, and how the reel gets from the truck to where it will sit.
- No form handy? Email info@dcwoodenspools.com with the same details and a few photos.
Reels you are likely to have
| Reel | Build | Flange | Traverse | Drum | Lb | Usually carries |
|---|---|---|---|---|---|---|
| C-5 | Nailed wood | 23 | 17 | 12 | 34 | Copper building wire, grounding |
| A-10 | Nailed wood | 30 | 22 | 16 | 66 | Service drop, bare aluminium |
| N-24 | Nailed wood | 36 | 28 | 14 | 83 | Insulated and multiplex cable |
| A-29 | Nailed wood | 42 | 28 | 21 | 154 | Overhead conductor, feeders |
| A-38 | Nailed wood | 48 | 28 | 24 | 212 | Aluminium and ACSR, large feeders |
| A-62 | Nailed wood | 60 | 28 | 28 | 397 | Utility conductor |
| A-76 | Nailed wood | 66 | 28 | 30 | 473 | Heavy conductor |
| S-120 | Steel, returnable | 84 | 36 | 42 | 895 | Transmission and medium voltage |
Other makers' reels differ by an inch or two. All flange sizes · How to measure
Questions the desk gets
Does the desk pick up a few reels from a downtown loading dock?
Yes. Most District pickups are small. Tell the desk the dock's hours, the clearance and how many reels there are.
Are Pepco's big transmission reels picked up by the desk?
Large steel reels from transmission cable usually belong to the cable maker and go back under its return policy. Wooden reels are a different matter; send a count.
Sources
Each opened and read on 9 November 2026.
- DC Public Service Commission, Capital Grid Project: Pepco project: 10 miles of new 230 kV underground line, Champlain and Harvard substations rebuilt, new Mount Vernon substation at First and K Streets NW
- DC Zoning Commission, Case 24-11 exhibit (ANC 5D02 letter, 20 October 2025): opposition to a proposed warehouse on New York Avenue NE at the Montana Triangle; Ivy City's concentration of industrial and PDR uses
- Maryland Office of People's Counsel, Pepco: Pepco serves 582,000 Maryland customers in most of Montgomery and Prince George's